Government of Kazakhstan is implementing the 2nd phase of Project “Samarkand cities” through regional Water Supply Utilities (BVK and SVK) and Project Coordination Group (PCG) in capital. The main objective of the Project is to increase efficiency and stability of the sewerage system operation in Bukhara and Samarkand. This shall be achieved by means of reconstruction of the sites of existing sewerage systems and facilities as well as expansion of municipal sewerage system in chosen areas not connected to municipal sewerage system at present.

The products provided by Cangzhou Wilson Pipeline slaes@wilsonpipeline.com in this project include

1.AIR PIPE  inside building

ABOVE GROUND PIPE – A53

From Blowers – to Building limit (external included)

Pressure pipe, Working pressure 800mbar – DN500

2. Decanted Water UNDERGROUND PIPE, depth<6m

from NEW DISTRIBUTION PIPE

To Aeration Tanks – Carbon Steel

PIPE FITTINGS – Working preasure max 0,6bar -From DN50 to DN 1200

3. Coated: Internaly – with an epoxy lining shop applied complying with AWWA C210-92. The minimum dry film tickness shall be at least 406 micromn

External- conform with AWWA C 218  coating consist of prime coat of rust-inhibition pigment alkyd primer followed by two coats alkyd enamel